You are only a click away from a Titus solution.

Role Based Solutions
Frequently Asked Questions
Titus Document Index
Search Representative

Titus Material Documentation

Please enter your zip code:
PlantSteel SupplierMiles to Plant
Ponca City, OK Sun Steel
Chicago Heights, IL
605
Miami Valley Steel
Cleveland, OH
889
Metals USA
Springfield, OH
860
Tarboro, NC Metals USA
Randleman, NC
125
Steel Technologies
Clinton, NC
112
Tucson, AZ Douglas Steel
Los Angeles, CA
442
El Paso, TX Douglas Steel
Los Angeles, CA
803

PlantAluminum SupplierMiles to Plant
Ponca City, OK Wells Hydro (Extrusion)
Monet, MO
242
Mandel Metals
Franklin Park, IL
780
Tarboro, NC Mandel Metals
Franklin Park, IL
952
Loxcreen (Extrusion)
Roxboro, NC
121
El Paso, TX Yarde Metals
Highpoint, NC
1739
Mandel Metals
Franklin Park, IL
1486


Due to some of the manufacturing processes that Titus uses, Titus does not use recycled steel or aluminum.

LEED states that mechanical, electrical, and plumbing (MEP) products as well as labor, overhead, and fees are not to be included in calculations for the Regional Material and Recycled Content Credits.

The reason for excluding MEP products is that typically, MEP products are not recycled or reused, which is the focus of the Material & Resources section of LEED. Including MEP products would increase the total material value of a project while not adding value to the total recycled or reused material content, and, therefore, make it more difficult to achieve the 5%, 10%, or 20% necessary to achieve some of the Material & Resource Credits.

Although the Credits state that MEP products should be excluded, they may be included in the calculations if desired. However, the same total material value must be used throughout the LEED credit calculations, so if MEP products are included, they must be in all Credit calculations.